Major Installations
PPS Enviro Power has been executing Roof Top PV projects since inception. The Major project executed in the initial stages of Company inception is for BHEL-EDN, Bangalore with whom PPS Enviro Power partnered to provide BOS Solution for JSTCDCL (Jharkhand State Tribal Cooperative Development Corp Ltd., an Institution for the backward class welfare. Building on the successful implementation of this project, PPS Enviro Power has gone on to provide niche and unique solutions to its customers. The Company executes projects worth 100 M INR each year.
UPES, Dehradun (India)
University of Petroleum & energy Studies (UPES), Dehradun decided to use the Renewable Energy for their University Campus by replacing the Diesel Genet to avoid using the fossil fuels.
The Ministry of New and Renewable Energy, New Delhi, India supported the Project through their Solar Policy 2009 – 10 (Roof Top Solar Power Systems). The total solar modules installed capacity in this university is 25kW x 4 Locations (Within the University).We have used Solar Modules of M/s. Central Electronics Limited PM160 type Solar Modules of 160 Nos. in each Plant.
The Generated Renewable Energy will be stored in the Lead Acid Low Maintenance Battery Bank (Exide Make) of 120V 2500 Ah. The AC Loads have been distributed through our 25kVA GSC Series Power Conditioning Units.
The load requirements have been met by this solar power plant for continuous 12 hours in a day with 2 days Sun Autonomy.
Operation | Technical Information |
---|---|
Installed Capacity | 25kWp x 4 Nos |
Installed Location | UPES, Dehradun (India) |
Client | UPES, Dehradun (India) |
Application | Hybrid Power Backup System |
Solar Modules Used | PM 160 Type (CEL) |
Financial Support | Partially Funded by MNRE, India |
Commissioned Date | March 2010 |
Telecome Tower Project
Reliance Industries Limited, Mumbai decided to use the Renewable Energy for their University Campus by replacing the Diesel Genet to avoid using the fossil fuels.
The Ministry of New and Renewable Energy, New Delhi, India supported the Project through their Solar Policy 2009 – 10 (Roof Top Solar Power Systems).The total solar modules installed capacity in this university is 25kW x 4 Locations (Within the University).
We have used Solar Modules of M/s. Central Electronics Limited PM160 type Solar Modules of 160 Nos. in each Plant.The Generated Renewable Energy will be stored in the Lead Acid Low Maintenance Battery Bank (Exide Make) of 120V 2500 Ah.
The AC Loads have been distributed through our 25kVA GSC Series Power Conditioning Units.The load requirements have been met by this solar power plant for continuous 12 hours in a day with 2 days Sun Autonomy.
Operation | Technical Information |
---|---|
Installed Capacity | 25kWp x 4 Nos |
Installed Location | UPES, Dehradun (India) |
Client | UPES, Dehradun (India) |
Application | Hybrid Power Backup System |
Solar Modules Used | PM 160 Type (CEL) |
Financial Support | Partially Funded by MNRE, India |
Commissioned Date | March 2010 |
Brahma Kumaris, Gurgoan, India
Brahma Kumaris Educational Society decided to use the Renewable Energy for their Academy by installing 202kWp Solar Power Plant under the subsidy scheme of MNRE, India. Through this successful demonstration of such a power plant encourage the members of the Academy and visitors to promote solar energy in the country and also to cater the essential load requirements in addition to function as online UPS.
The total solar modules installed capacity in this Academy is 202kWp. We have used Solar Modules of M/s. Central Electronics Limited PM75 type Solar Modules. The Generated Renewable Energy will be stored in the Lead Acid Low Maintenance Battery Bank (Exide Make) of 240V 2500 Ah. The AC Loads have been distributed through our 50kVA GSC Series Power Conditioning Units. The load requirements have been met by this solar power plant for continuous 12 hours in a day with 2 days Sun Autonomy.
Operation | Technical Information |
---|---|
Installed Capacity | 202kWp. |
Installed Location | BKES, Gurgoan. |
Client | BKES, Gurgoan |
Application | Hybrid Power Backup System |
Solar Modules Used | PM 75 Type (CEL) |
Financial Support | Partially Funded by MNRE, India |
Commissioned Date | March 2006 |
Gujarat 10MW Solar Farm - India
The Land of Gods and the Sun – Gujarat Solar Park – The World’s largest Solar Installations having Irradiance of more than 5.8kWhr. Gujarat Solar Park having installed capacity of more than 500MWp from various Project Developers and our contribution to the country is 10MW Solar Farm.
10MWp Solar Farm installed by us for our Client M/s. NKG Infrastructure Ltd, Ahmedabad uses 63 Acres of leveled land. The Solar Array is equipped with Superior Quality Multi-Crystalline Solar Modules from Solar World-Germany and String Inverters from Delta for very high conversion efficiency. The Solar Array generates around 57MWhr units on daily basis and reduces Carbon Emission of about XXXX Tons per day Estimated Annual Yield of 18810MWhr with Co2 savings of XXXX Tons per year Asia’s Largest Plant with String Inverters.
Operation | Technical Information |
---|---|
Installed Location | Charanka, Dist – Patan, Gujarat, India |
Estimated Annual Yield | 18810MWhr |
Estimated Annual Co2 Savings | XXXXX Tons |
Application | Hybrid Power Backup System |
Installed Capacity | 10.6MWp |
45096 Nos. of Solar Modules | Solar World SW235 Poly |
1879 Nos. of String Inverters | Delta – Solivia 5.0 EU G3 |
Commissioned Date | January 2012 |
HPCL(Hindustan Petroleum Corporation Ltd)
Hindustan Petroleum Corporation Ltd decided to use the Renewable Energy for various fuel dispensing stations across India by installing 6kWp Solar Power Plant in 57 locations across India. All the fuel dispensing pumps will be operating through Renewable Energy. The total solar modules installed capacity for this project is 6kWp.
We have used Solar Modules of M/s. Bharat Heavy Electrical Ltd, L24165 type Solar Modules. The Generated Renewable Energy will be stored in the Lead Acid Low Maintenance Battery Bank (Exide Make) of 96V 500 Ah. The motor loads have been distributed through our 6kVA GSC Series Power Conditioning Units. The load requirements have been met by this solar power plant for continuous 12 hours in a day with 2 days Sun Autonomy.
Operation | Technical Information |
---|---|
Installed Capacity | 6kWp x 57 Locations |
Installed Location | Across India |
Client | Hindustan Petroleum Corporation Ltd |
Application | Hybrid Power Backup System |
Solar Modules Used | PM 24165 Type (BHEL) |
Financial Support | - |
Commissioned Date | March 2008 |
Jharkhand State Tribal Co-operative Corporation Ltd
Jharkhand State Tribal Co-operative Corporation Ltd decided to use the Renewable Energy for their Tribal Residential Schools / Hostels spread over various parts of Jharkhand State where the conventional electrical cannot be reachable for the next 25 years. By this way, JSTCDCL helped their students of its state to provide illumination during the night and it helped students to be safe from the dark woods.
fuel dispensing stations across India by installing 6kWp Solar Power Plant in 57 locations across India. All the fuel dispensing pumps will be operating through Renewable Energy. The total solar modules installed capacity for this project is 6kWp. We have used Solar Modules of M/s. Bharat Heavy Electrical Ltd, L24165 type Solar Modules.
The Generated Renewable Energy will be stored in the Lead Acid Low Maintenance Battery Bank (Exide Make) of 96V 500 Ah. The motor loads have been distributed through our 6kVA GSC Series Power Conditioning Units. The load requirements have been met by this solar power plant for continuous 12 hours in a day with 2 days Sun Autonomy.
Operation | Technical Information |
---|---|
Installed Capacity | 6kWp x 57 Locations |
Installed Location | Across India |
Client | Hindustan Petroleum Corporation Ltd |
Application | Hybrid Power Backup System |
Solar Modules Used | PM 24165 Type (BHEL) |
Financial Support | - |
Commissioned Date | March 2008 |
Jharkhand Renewable Energy Development Agency, Ranchi.
Brahma Kumaris Educational Society decided to use the Renewable Energy for their Academy by installing 202kWp Solar Power Plant under the subsidy scheme of MNRE, India. Through this successful demonstration of such a power plant encourage the members of the Academy and visitors to promote solar energy in the country and also to cater the essential load requirements in addition to function as online UPS. The total solar modules installed capacity in this Academy is 202kWp. We have used Solar Modules of M/s. Central Electronics Limited PM75 type Solar Modules.The Generated Renewable Energy will be stored in the Lead Acid Low Maintenance Battery Bank (Exide Make) of 240V 2500 Ah. The AC Loads have been distributed through our 50kVA GSC Series Power Conditioning Units. The load requirements have been met by this solar power plant for continuous 12 hours in a day with 2 days Sun Autonomy.
Project Highlights:
Operation | Technical Information |
---|---|
Project Name | Rural Village Electrification Programme in 82 Villages. |
Client | Jharkhand Renewable Energy Development Agency, Ranchi. |
Location | All districts covered in Jharkhand State. |
Application | Hybrid Power Backup System |
Scope | Supply, Installation & Commissioning of Solar Home Light Systems and Street Light Systems in Remote Villages of Jharkhand. |
Project Cost | INR 120 Millions. |
Commissioned Date | June 2006 |
Sahiba - 1.5MW , Balachaur, Punjab- India
The Land of Gods and the Sun –Having Solar Irradiance of more than 5.8kWhr 1.5MWp Solar Farm installed by us uses 10 Acres of leveled land. The Solar Array is equipped with Superior Quality Multi-Crystalline Solar Modules from Solar Semiconductor and String Inverters from Delta for very high conversion efficiency. The Solar Array generates around 6750kWhr or units on daily basis and reduces Carbon Emission of about 3.68 Tons per day Estimated Annual Yield of 2,400,000 kWhr with Co2 savings of 1300 Tons per year.
Operation | Technical Information |
---|---|
Installed Capacity | 1.5MWp |
Installed Location | Sahiba, Dist – Nawansher, Punjab, India . |
Estimated Annual Yield | 2,400,000 kWhr |
Estimated Annual Co2 Savings | 1300 Tons |
6752 Nos. of Solar Modules | Solar Semiconductor SSI 230 Poly |
72 Nos. of String Inverters | Delta – Solivia 20 TL (Transformer Less Inverter) |
Commissioned Date | April 2012 |
5MWP – Sahiba,Balachaur, Punjab- India
The Land of Gods and the Sun –Having Solar Irradiance of more than 5.8kWhr 5MWp Solar Farm installed by us uses 30 Acres of leveled land. The Solar Array is equipped with Superior Quality Multi-Crystalline Solar Modules from Solar Semiconductor and String Inverters from Delta for very high conversion efficiency. The Solar Array generates around 22500kWhr or units on daily basis and reduces Carbon Emission of about 12.20 Tons per day Estimated Annual Yield of 82, 12, 500 kWhr with Co2 savings of 4450 Tons per year.
Operation | Technical Information |
---|---|
Installed Capacity | 5MWp |
Installed Location | Sahiba, Dist – Nawansher, Punjab, India . |
Estimated Annual Yield | 82,12,500 kWhr |
Estimated Annual Co2 Savings | 4450 Tons |
23040 Nos. of Solar Modules | Solar Semiconductor SSI 230 Poly |
240 Nos. of String Inverters | Delta – Solivia 20 TL (Transformer Less Inverter) |
Commissioned Date | January 2013 |
20kWp - BHEL, Ranipet
Bharat Heavy Electricals Limited (BHEL) decided to use the Renewable Energy for one of their Roof Tops in their own Boiler Auxiliary Plant in Ranipet. A small 20kWp Roof Top Based Solar Power Plant was planned and executed as Pilot Project for their own consumption.
The project has been executed through BHEL, EDN, Bangalore through competitive bidding process. Through this successful demonstration of such power plant, BHEL planned to go for Grid Tie Based Solar Power Plant for their own consumption in their Roof Top Buildings. Already 500kW Project has been executed by BHEL following up the success of this Grid Tie based Solar Power Plant.
The total solar modules installed capacity in this Academy is 20kWp. We have used Solar Modules of M/s. Bharat Heavy Electrical Limited (L–24220) type Solar Modules. The Generated Renewable Energy will be exported to their internal Grid and used.
Operation | Technical Information |
---|---|
Installed Capacity | 20kWp |
Installed Location | Boiler Auxiliary Plant, BHEL, Ranipet |
Client | Bharat Heavy Electrical Limited, Electronics Division, Bangalore |
Application | Grid Tie System |
Solar Modules Used | BHEL – L24220 |
Financial Support | BHEL |
Commissioned Date | - |
Dayalbagh Educational Society, Agra
Dayalbagh Educational Institute decided to use the Renewable Energy for their Academy by installing 90kWp Solar Power Plant through their own funds to reduce the consumption of fossil fuels. The project has been executed through BHEL, EDN, Bangalore through competitive bidding process.
Through this successful demonstration of such a power plant encourage the members of the Academy and visitors to promote solar energy in the country and also to cater the essential load requirements in addition to function as online UPS. The total solar modules installed capacity in this Academy is 90kWp.
We have used Solar Modules of M/s. Bharat Heavy Electrical Limited L 24220 type Solar Modules.The Generated Renewable Energy will be stored in the Lead Acid Low Maintenance Battery Bank (Exide Make) of 240V 750 Ah.
The AC Loads have been distributed through our 2 x 50kVA GSC Series Power Conditioning Units. The load requirements have been met by this solar power plant for continuous 12 hours in a day with 2 days Sun Autonomy.
Operation | Technical Information |
---|---|
Installed Capacity | 90kWp |
Installed Location | Dayalbagh Educational Institute. |
Client | Bharat Heavy Electrical Limited, Electronics Division, Bangalore. |
Application | Hybrid Power Backup System. |
Solar Modules Used | BHEL – L24220. |
Financial Support | Dayalbagh Educational Institute. |
Commissioned Date | March 2010 |