PPS Enviro Power has been executing Roof Top PV projects since inception. The Major project executed in the initial stages of Company inception is for BHEL-EDN, Bangalore with whom PPS Enviro Power partnered to provide BOS Solution for JSTCDCL (Jharkhand State Tribal Cooperative Development Corp Ltd., an Institution for the backward class welfare. Building on the successful implementation of this project, PPS Enviro Power has gone on to provide niche and unique solutions to its customers. The Company executes projects worth 100 M INR each year.


UPES, Dehradun (India)

University of Petroleum & energy Studies (UPES), Dehradun decided to use the Renewable Energy for their University Campus by replacing the Diesel Genet to avoid using the fossil fuels.

The Ministry of New and Renewable Energy, New Delhi, India supported the Project through their Solar Policy 2009 – 10 (Roof Top Solar Power Systems). The total solar modules installed capacity in this university is 25kW x 4 Locations (Within the University).

We have used Solar Modules of M/s. Central Electronics Limited PM160 type Solar Modules of 160 Nos. in each Plant.

The Generated Renewable Energy will be stored in the Lead Acid Low Maintenance Battery Bank (Exide Make) of 120V 2500 Ah. The AC Loads have been distributed through our 25kVA GSC Series Power Conditioning Units.

The load requirements have been met by this solar power plant for continuous 12 hours in a day with 2 days Sun Autonomy.

Operation Technical Information
Installed Capacity 25kWp x 4 Nos
Installed Location UPES, Dehradun (India)
Client UPES, Dehradun (India)
Application Hybrid Power Backup System
Solar Modules Used PM 160 Type (CEL)
Financial Support Partially Funded by MNRE, India
Commissioned Date March 2010

Telecome Tower Project

Reliance Industries Limited, Mumbai decided to use the Renewable Energy for their University Campus by replacing the Diesel Genet to avoid using the fossil fuels.

The Ministry of New and Renewable Energy, New Delhi, India supported the Project through their Solar Policy 2009 – 10 (Roof Top Solar Power Systems).

The total solar modules installed capacity in this university is 25kW x 4 Locations (Within the University).

We have used Solar Modules of M/s. Central Electronics Limited PM160 type Solar Modules of 160 Nos. in each Plant.The Generated Renewable Energy will be stored in the Lead Acid Low Maintenance Battery Bank (Exide Make) of 120V 2500 Ah.

The AC Loads have been distributed through our 25kVA GSC Series Power Conditioning Units.The load requirements have been met by this solar power plant for continuous 12 hours in a day with 2 days Sun Autonomy.

Operation Technical Information
Installed Capacity 25kWp x 4 Nos
Installed Location UPES, Dehradun (India)
Client UPES, Dehradun (India)
Application Hybrid Power Backup System
Solar Modules Used PM 160 Type (CEL)
Financial Support Partially Funded by MNRE, India
Commissioned Date March 2010

Brahma Kumaris, Gurgoan, India

Brahma Kumaris Educational Society decided to use the Renewable Energy for their Academy by installing 202kWp Solar Power Plant under the subsidy scheme of MNRE, India. Through this successful demonstration of such a power plant encourage the members of the Academy and visitors to promote solar energy in the country and also to cater the essential load requirements in addition to function as online UPS.

The total solar modules installed capacity in this Academy is 202kWp. We have used Solar Modules of M/s. Central Electronics Limited PM75 type Solar Modules. The Generated Renewable Energy will be stored in the Lead Acid Low Maintenance Battery Bank (Exide Make) of 240V 2500 Ah. The AC Loads have been distributed through our 50kVA GSC Series Power Conditioning Units. The load requirements have been met by this solar power plant for continuous 12 hours in a day with 2 days Sun Autonomy.

Operation Technical Information
Installed Capacity 202kWp.
Installed Location BKES, Gurgoan.
Client BKES, Gurgoan
Application Hybrid Power Backup System
Solar Modules Used PM 75 Type (CEL)
Financial Support Partially Funded by MNRE, India
Commissioned Date March 2006

Gujarat 10MW Solar Farm - India

The Land of Gods and the Sun – Gujarat Solar Park – The World’s largest Solar Installations having Irradiance of more than 5.8kWhr. Gujarat Solar Park having installed capacity of more than 500MWp from various Project Developers and our contribution to the country is 10MW Solar Farm.

10MWp Solar Farm installed by us for our Client M/s. NKG Infrastructure Ltd, Ahmedabad uses 63 Acres of leveled land. The Solar Array is equipped with Superior Quality Multi-Crystalline Solar Modules from Solar World-Germany and String Inverters from Delta for very high conversion efficiency. The Solar Array generates around 57MWhr units on daily basis and reduces Carbon Emission of about XXXX Tons per day Estimated Annual Yield of 18810MWhr with Co2 savings of XXXX Tons per year Asia’s Largest Plant with String Inverters.

Operation Technical Information
Installed Location Charanka, Dist – Patan, Gujarat, India
Estimated Annual Yield 18810MWhr
Estimated Annual Co2 Savings XXXXX Tons
Application Hybrid Power Backup System
Installed Capacity 10.6MWp
45096 Nos. of Solar Modules Solar World SW235 Poly
1879 Nos. of String Inverters Delta – Solivia 5.0 EU G3
Commissioned Date January 2012

HPCL(Hindustan Petroleum Corporation Ltd)

Hindustan Petroleum Corporation Ltd decided to use the Renewable Energy for various fuel dispensing stations across India by installing 6kWp Solar Power Plant in 57 locations across India. All the fuel dispensing pumps will be operating through Renewable Energy. The total solar modules installed capacity for this project is 6kWp.

We have used Solar Modules of M/s. Bharat Heavy Electrical Ltd, L24165 type Solar Modules. The Generated Renewable Energy will be stored in the Lead Acid Low Maintenance Battery Bank (Exide Make) of 96V 500 Ah. The motor loads have been distributed through our 6kVA GSC Series Power Conditioning Units. The load requirements have been met by this solar power plant for continuous 12 hours in a day with 2 days Sun Autonomy.

Operation Technical Information
Installed Capacity 6kWp x 57 Locations
Installed Location Across India
Client Hindustan Petroleum Corporation Ltd
Application Hybrid Power Backup System
Solar Modules Used PM 24165 Type (BHEL)
Financial Support -
Commissioned Date March 2008

Jharkhand State Tribal Co-operative Corporation Ltd

Jharkhand State Tribal Co-operative Corporation Ltd decided to use the Renewable Energy for their Tribal Residential Schools / Hostels spread over various parts of Jharkhand State where the conventional electrical cannot be reachable for the next 25 years. By this way, JSTCDCL helped their students of its state to provide illumination during the night and it helped students to be safe from the dark woods.

fuel dispensing stations across India by installing 6kWp Solar Power Plant in 57 locations across India. All the fuel dispensing pumps will be operating through Renewable Energy. The total solar modules installed capacity for this project is 6kWp. We have used Solar Modules of M/s. Bharat Heavy Electrical Ltd, L24165 type Solar Modules.

The Generated Renewable Energy will be stored in the Lead Acid Low Maintenance Battery Bank (Exide Make) of 96V 500 Ah. The motor loads have been distributed through our 6kVA GSC Series Power Conditioning Units. The load requirements have been met by this solar power plant for continuous 12 hours in a day with 2 days Sun Autonomy.

Operation Technical Information
Installed Capacity 6kWp x 57 Locations
Installed Location Across India
Client Hindustan Petroleum Corporation Ltd
Application Hybrid Power Backup System
Solar Modules Used PM 24165 Type (BHEL)
Financial Support -
Commissioned Date March 2008

Jharkhand Renewable Energy Development Agency, Ranchi.

Brahma Kumaris Educational Society decided to use the Renewable Energy for their Academy by installing 202kWp Solar Power Plant under the subsidy scheme of MNRE, India. Through this successful demonstration of such a power plant encourage the members of the Academy and visitors to promote solar energy in the country and also to cater the essential load requirements in addition to function as online UPS. The total solar modules installed capacity in this Academy is 202kWp. We have used Solar Modules of M/s. Central Electronics Limited PM75 type Solar Modules.The Generated Renewable Energy will be stored in the Lead Acid Low Maintenance Battery Bank (Exide Make) of 240V 2500 Ah. The AC Loads have been distributed through our 50kVA GSC Series Power Conditioning Units. The load requirements have been met by this solar power plant for continuous 12 hours in a day with 2 days Sun Autonomy.

Project Highlights:

  • Home Lights for households and Street Lighting Systems for village lanes.
  • Power backup for Children Education.
  • High reliability.
  • Operation Technical Information
    Project Name Rural Village Electrification Programme in 82 Villages.
    Client Jharkhand Renewable Energy Development Agency, Ranchi.
    Location All districts covered in Jharkhand State.
    Application Hybrid Power Backup System
    Scope Supply, Installation & Commissioning of Solar Home Light Systems and Street Light Systems in Remote Villages of Jharkhand.
    Project Cost INR 120 Millions.
    Commissioned Date June 2006

    Sahiba - 1.5MW , Balachaur, Punjab- India

    The Land of Gods and the Sun –Having Solar Irradiance of more than 5.8kWhr 1.5MWp Solar Farm installed by us uses 10 Acres of leveled land. The Solar Array is equipped with Superior Quality Multi-Crystalline Solar Modules from Solar Semiconductor and String Inverters from Delta for very high conversion efficiency. The Solar Array generates around 6750kWhr or units on daily basis and reduces Carbon Emission of about 3.68 Tons per day Estimated Annual Yield of 2,400,000 kWhr with Co2 savings of 1300 Tons per year.

    Operation Technical Information
    Installed Capacity 1.5MWp
    Installed Location Sahiba, Dist – Nawansher, Punjab, India .
    Estimated Annual Yield 2,400,000 kWhr
    Estimated Annual Co2 Savings 1300 Tons
    6752 Nos. of Solar Modules Solar Semiconductor SSI 230 Poly
    72 Nos. of String Inverters Delta – Solivia 20 TL (Transformer Less Inverter)
    Commissioned Date April 2012

    5MWP – Sahiba,Balachaur, Punjab- India

    The Land of Gods and the Sun –Having Solar Irradiance of more than 5.8kWhr 5MWp Solar Farm installed by us uses 30 Acres of leveled land. The Solar Array is equipped with Superior Quality Multi-Crystalline Solar Modules from Solar Semiconductor and String Inverters from Delta for very high conversion efficiency. The Solar Array generates around 22500kWhr or units on daily basis and reduces Carbon Emission of about 12.20 Tons per day Estimated Annual Yield of 82, 12, 500 kWhr with Co2 savings of 4450 Tons per year.

    Operation Technical Information
    Installed Capacity 5MWp
    Installed Location Sahiba, Dist – Nawansher, Punjab, India .
    Estimated Annual Yield 82,12,500 kWhr
    Estimated Annual Co2 Savings 4450 Tons
    23040 Nos. of Solar Modules Solar Semiconductor SSI 230 Poly
    240 Nos. of String Inverters Delta – Solivia 20 TL (Transformer Less Inverter)
    Commissioned Date January 2013

    20kWp - BHEL, Ranipet

    Bharat Heavy Electricals Limited (BHEL) decided to use the Renewable Energy for one of their Roof Tops in their own Boiler Auxiliary Plant in Ranipet. A small 20kWp Roof Top Based Solar Power Plant was planned and executed as Pilot Project for their own consumption.

    The project has been executed through BHEL, EDN, Bangalore through competitive bidding process. Through this successful demonstration of such power plant, BHEL planned to go for Grid Tie Based Solar Power Plant for their own consumption in their Roof Top Buildings. Already 500kW Project has been executed by BHEL following up the success of this Grid Tie based Solar Power Plant.

    The total solar modules installed capacity in this Academy is 20kWp. We have used Solar Modules of M/s. Bharat Heavy Electrical Limited (L–24220) type Solar Modules. The Generated Renewable Energy will be exported to their internal Grid and used.

    Operation Technical Information
    Installed Capacity 20kWp
    Installed Location Boiler Auxiliary Plant, BHEL, Ranipet
    Client Bharat Heavy Electrical Limited, Electronics Division, Bangalore
    Application Grid Tie System
    Solar Modules Used BHEL – L24220
    Financial Support BHEL
    Commissioned Date -

    Dayalbagh Educational Society, Agra

    Dayalbagh Educational Institute decided to use the Renewable Energy for their Academy by installing 90kWp Solar Power Plant through their own funds to reduce the consumption of fossil fuels. The project has been executed through BHEL, EDN, Bangalore through competitive bidding process.

    Through this successful demonstration of such a power plant encourage the members of the Academy and visitors to promote solar energy in the country and also to cater the essential load requirements in addition to function as online UPS. The total solar modules installed capacity in this Academy is 90kWp.

    We have used Solar Modules of M/s. Bharat Heavy Electrical Limited L 24220 type Solar Modules.The Generated Renewable Energy will be stored in the Lead Acid Low Maintenance Battery Bank (Exide Make) of 240V 750 Ah.

    The AC Loads have been distributed through our 2 x 50kVA GSC Series Power Conditioning Units. The load requirements have been met by this solar power plant for continuous 12 hours in a day with 2 days Sun Autonomy.

    Operation Technical Information
    Installed Capacity 90kWp
    Installed Location Dayalbagh Educational Institute.
    Client Bharat Heavy Electrical Limited, Electronics Division, Bangalore.
    Application Hybrid Power Backup System.
    Solar Modules Used BHEL – L24220.
    Financial Support Dayalbagh Educational Institute.
    Commissioned Date March 2010